Optimization of distribution network and non-revenue water reduction through active pressure control
The project aimed at the optimization of the distribution network by reducing non-revenue water in 17 sub-sectors of Bogota (zone 4 district) through active pressure control.
The 2 mains activities of the project were:
- Update hydraulics model for 17 sub-districts
- Design, supply and install 17 active pressure control stations