WMI - Water Management International
Accueil site
Visitez le site http://www.vinci-construction.com/
Français  |  English  |  Español
Expression Graphique
REFERENCES
By country
By project

Palau
"KOROR-AIRAI SANITATION PROJECT (KSAP)" – WASTEWATER FLOW MEASUREMENT CAMPAIGN (LOT 1) AND WASTEWATER AANALYSIS (LOT 2)
In the framework of ADB funded KSAP Project, WMI has been sub-contracted for carrying out a wastewater flow measurement campaign (Lot 1) and wastewater analysis (Lot 2) on the Sewerage System of Koror, Palau.
More project details  
Algeria
ASSESSMENT AND REHABILITATION STUDIES OF THE DRINKING WATER SYSTEMS OF THE TOWN OF SAIDA AND BECHAR
For each drinking water distribution network (Saida and Bechar towns: 400,000 inhabitants, network: 1,000 km):
• Data entry of drawings and existing system Geographical Information System (GIS),
• Diagnosis of existing distribution network and copy writing of bidding document,
• Diagnosis of the existing water supply system,
• Preparation of the master plan for the refurbishment and the extension of the water supply network,
• Supporting the technical and commercial management of the public corporation.
More project details  
Bahamas
SUPERVISION CONSULTANT FOR THE EXECUTION OF A 15 YEAR NON-REVENUE WATER PROGRAM IN NASSAU AND NEW PROVIDENCE ISLAND
The overall project aims at reducing the NRW in New Providence Island. The current Non-Revenue Water ratio is around 52% of the water input.
More project details  
Barbados
BARBADOS WATER METER REPLACEMENT PROGRAMME (SMART ULTRASONIC METERS - INTEGRATED AMR SYSTEM)
The Barbados Water Authority (BWA) is carrying out an ambitious replacement program for all water meters of its customers throughout the island. It includes the complete restructuring of its commercial management system. WMI is in charge of updating the cadastre and installing 82,000 smart domestic meters (non-mechanical technology – ultrasound, equipped with integrated AMR system).

More project details  
Cameroon
INSPECTION AND AUDIT OF DEFINED TRANFER LINES OF YAOUNDE WATER PRODUCTION NETWORK OF LA MEFOU
Audit of transfer lines between the Méfou dam, the treatment plant and the tanks Messa, Attémangué and Mission. Rehabilitation of the canalization using tubing.
More project details  
Colombia
OPTIMIZATION OF DISTRICITION NETWORK AND NRW REDUCTION FOR 17 SUB-SECTORS OF BOGOTA (COLOMBIA) THROUGH ACTIVE PRESSURE CONTROL
The project aimed at the optimization of the distribution network by reducing NRW in 17 sub-sectors of Bogota (ZONE 4 district) through Active Pressure Control.  The 2 mains activities of the project were:

  • Update Hydraulics Model for 17 sub-districts;

  • Design, supply and install 17 Active Pressure Control Stations.

  • More project details  
    Colombia
    PILOT PROJECT OF OPTOMIZATION OF LARGE CUSTOMER METERING, INCLUDING THE ESTABLISHMENT OF A SYSTEM OF AUTOMATED METER READING (AMR), IN PEREIRA, COLOMBIA
    WMI has been selected by the Water Company of Pereira to implement a Pilot project on the drinking water network and reduce Non-Revenue Water (NRW) by improving the management of large customers. The two main activities of the project are:

  • Design, supply and construction of 30 measurement points of  large customers with new water meters equipped for automated meter reading (AMR) system;

  • Design and installation of a platform to monitor the consumption.

  • More project details  
    Colombia
    PILOT PROJECT FOR THE REDUCTION OF WATER LOSSES IN THE DISTRIBUTION NETWORK OF CALI, COLOMBIA
    Project of water losses reduction in the distribution network of the city of Cali, in 3 pilot areas (Total of 147 km of network, 18 000 customers).
    More project details  
    Colombia
    PILOT PROGRAM FOR THE STRENGTHENING OF WATER MEASUREMENTS OF THE CITY OF CALI, COLOMBIA
    Installation of 80 meters (1” to 4”) with a remote management system for industries and 10 district meters for the human settlements in development (AHDI), including hydraulic accessories,  new  chambers, equipped with a cover and a security system.
    More project details  
    Colombia
    LOCALISATION AND REPAIR OF NON-VISIBLE LEAKS IN THE CITY OF CALI, COLOMBIA
    Detection and repair of leaks in 2 different areas of the city of Cali (total of 732 km of network).
    More project details  
    Dominican Republic
    NON-REVENUE WATER AUDIT AND REDUCTION OF THE DRINKING WATER SYSTEM OF SAN PEDRO DE MACORIS, GUAYACANES AND CONSUELO - DOMINICAN REPUBLIC
    Non-Revenue Water audit and reduction of the Drinking Water system of San Pedro de Macoris (200,000 pop.), Guayacanes (16,000 inhab.) And Consuelo (30,000 pop.).

    More project details  
    Galapagos
    PARTNERSHIP FOR SUSTAINABLE WATER LOSS CONTROL AND REDUCTION ON THE GALAPAGOS ISLANDS
    The objective of the project is to improve the strategy planning and implementation capacities for efficient water management and water loss reduction within the Municipal Government of the Island of Santa Cruz, Galapagos.

    More project details  
    Haiti
    ADMINISTRATIVE AUDIT OF THE CAMEP (CENTRALE AUTONOME METROPOLITAINE D'EAU POTABLE) OF PORT-AU-PRINCE
    WMI was selected as leader of the consortium formed by WMI and Cecom (Haitian company) to do an administrative audit of the CAMEP (the water distribution company of Port au Prince, Haiti’s main city).
    More project details  
    Jamaica
    PHASE 2 - PERFORMANCE BASED CONTRACT FOR NRW REDUCTION IN THE NORTH WESTERN PARISHES - SERVICE IMPROVEMENT SUSTAINABILITY
    The water supply system involved in this contract is the one feeding the major urban centers of the parishes of Hanover, Saint James, Trelawny and Westmoreland (i.e., Negril, Lucea, Montego Bay, Falmouth and Duncans).The area of the contract covers more than one quarter of the Jamaican Island.
    This contract‘s main target is the follow-up of the Network Service Improvement Programme with the objective of long-term sustainability of UFW and billable consumption improvements from the previous contract (Contract 1, Phase 1) in the Project Area. In this maintenance contract the consortium managed on-going works to maintain gains made over the two previous years, for a three-year period, in respect with the two targets from Contract 1, Phase 1.
    More project details  
    Jamaica
    JAMAICAN WATER SUPPLY IMPROVEMENT PROJECT (JWSIP) – COMPONENT : COMMERCIAL AND TECHNICAL PERFORMANCE IMPROVEMENT OF THE WATER SUPPLY SYSTEM OF KINGSTON METROPOLITAN AREA - PHASE 1
    Improving the Jamaican water supply network for stage 1: Laying of 6 km of DN600 pipes, upgrading two water-treatment stations (Sea View : 91,000 m3/d and Constant Spring: 191,000 m3/d), building of two storage tanks of 800 m3, laying of 40 km of galvanized pipes (DN 50, 80, 150 et 200).
    More project details  
    Jamaica
    GREAT RIVER / LUCEA WATER SUPPLY PROJECT - NETWORK SERVICE IMPROVEMENT
    In order to improve the efficiency of the work of Sogea-Satom, selected to increase the drinking water treatment plant capacity in Great River and install the iron supply main pipe ND 500 to Lucea , National Water Commission asked WMI to audit and improve the distribution network of areas affected by such investments.
    More project details  
    Jamaica
    PHASE 1 - PERFORMANCE BASED CONTRACT FOR THE WATER SUPPLY SERVICE IMPROVEMENT OF THE NORTH WESTERN PARISHES OF JAMAICA
    Improvement of distribution system of drinking water in the North Western Parishes area including the counties of Trelawny, St. James, Hanover Parish, Negril, with a total population connected to the drinking water distribution system of 380,000 people.

    Performance Contract for a period of five years, financial remuneration associated with the following objectives throughout the project area:
    • 20% increase in technical performance of the network,
    • 35% increase in consumption billed.
    More project details  
    Jamaica
    AUDIT OF THE WATER DISTRIBUTION NETWORKS OF FIVE CITIES IN JAMAICA
    Audit of five distribution networks of Ocho Rios, Mandeville, Forrest Hills, May Pen and Old Harbour for a total network length of 950 km and around 50,000 customers.
    More project details  
    Jamaica
    JAMAICAN WATER SUPPLY IMPROVEMENT PROJECT (JWSIP) - CATEGORY A1 WORKS
    ACTION PLAN IMPLEMENTATION FOR NRW REDUCTION IN STONY HILL AREA
    WMI and NWC were engaged in a co-management arrangement for the Reduction of Non-Revenue Water (NRW) for the Stony Hill area.
    More project details  
    Morocco
    REDUCTION OF THE PHYSICAL WATER LOSSES OF THE WATER DISTRIBUTION NETWORK OF CASABLANCA
    Reduce as much as possible the physical water losses in the critical water supplying area (WSA) of Casablanca city (supplying time 24h/24h), Lydec, delegated authority operating on the network with the aim of reaching as soon as possible an overall network efficiency of 85%.
    More project details  
    Myanmar
    PREPARATION OF PROGRAM FOR NON-REVENUE WATER REDUCTION IN 3 PRIORITY TOWNSIPS OF YANGON, MYANMAR
    The project aims establishing a comprehensive Action Plan for reducing the NRW factor in Yangon City. It is based on surveys  and measurements done in 3 Townships located downtown supposed to be the more affected by NRW. It includes commercial and technical aspects of the NRW reduction strategy for a pilot zone representing:

  • 394 kms of network

  • 50 719 domestic customers

  • 676 019 persons


  • More project details  
    Palestine
    IMPROVEMENT OF THE WATER INFRASTRUCTURES OF THE CITIES OF GAZA AND WEST BANK
    Implementation of a full program for the reduction of Non Revenue Water on various networks in the West bank and the cities of Gaza, with a contractual technical efficiency target fixed at 75 to 80% to be achieved.
    More project details  
    Serbia
    IMPROVEMENT OF THE WATER DISTRIBUTION INFRASTURCTURES AND REDUCTION OF NON REVENUE WATER IN KRAGUJEVAC AND BELGRADE
    Strongly supported by the French Government, a complete program of research, reduction and control of unaccounted water volumes was established for the city of Kragujevac (150,000 inhabitants, 480 km of distribution network) along with a preparatory mission for the city of Belgrade.
    More project details  
    Tanzania
    ESTABLISHMENT OF A BASELINE AND PREPARATION OF TECHNICAL SPECIFICATIONS FOR THE IMPLEMENTATION OF A PERFORMANCE BASED CONTRACT FOR THE REDUCTION OF NON REVENUE WATER IN DAR-ES-SALAAM
    Integrated Assessment of Non Revenue Water of the drinking water supply system of Dar es Salaam and preparation of an action plan to reduce Non Revenue Water from 60% to 45%.
    More project details  
    Turkey
    DIAGNOSIS AND ACTION PLAN TO REDUCE NON REVENUE WATER DISTRIBUTION NETWORK OF ISTANBUL
    Integrated Project for the diagnosis and the reduction of Non Revenue Water in the study area of Sultanahmet Eminonu, in the center of Istanbul.
    More project details  
    Uganda
    NON REVENUE WATER REDUCTION PROJECT IN TWO INDUSTRIAL PILOT OF THE CITY OF KAMPALA
    The project objectives include:
    • The implementation of a program to reduce Non Revenue Water in two pilot areas of the city of Kampala,
    • The network diagnosis, flow and pressures measurement campaigns and leak detection campaigns (200 km of network),
    • The evaluation of over 100 large consumers,
    • The identification and implementation of a monitoring network performance indicator (Infrastructure Leakage Index).
    More project details  
    Vietnam
    NON REVENUE WATER REDUCTION PROJECT APPLIED TO THE "AN DIEN - AN PHU" PILOT ZONE OF HO CHI MINH CITY
    WMI was selected by the Water Company of Ho Chi Minh to carry out a diagnosis of Non Revenue Water and implement immediate solutions in primary areas of the city (40% of Non Revenue Water).
    More project details  
    Zanzibar
    ZAWA PILOT SCHEME FOR THE CONTROL AND REDUCTION OF NON-REVENUE WATER IN THE ZANZIBAR CITY WATER SUPPLY SYSTEM
    Integrated Project for the diagnosis and the reduction of Non-Revenue Water in a pilot area of the water supply system of Zanzibar city.

    More project details  
    LEGAL NOTICES   .   SITE MAP   .   WWW.VINCI-CONSTRUCTION-PROJECTS.COM