WMI - Water Management International
Accueil site
Visitez le site http://www.vinci-construction.com/
Français  |  English  |  Español
Expression Graphique
28.09.2015
OPTIMIZATION OF THE DISTRIBUTION NETWORK OF DRINKING WATER THROUGH ACTIVE PRESSURE CONTROL OF 17 SUB-SECTORS OF THE ZONE 4 OF BOGOTA, COLOMBIA



WMI is mandated by the Bogota Water Company (EAAB) for the rehabilitation and optimization of the operation of 17 Active Pressure Control Stations in the zone 4 of the water distribution network of Bogota. The contract was signed on 26th December of 2014 for a period of 9 months.
 
28.09.2015
PILOT PROJECT FOR THE OPTIMIZATION OF THE METERING QUALITY OF LARGE CONSUMERS OF THE DRINKING WATER NETWORK OF PEREIRA, COLOMBIA

WMI is mandated by the Pereira Water Company for a first phase of design/supply/installation of 30 measurement points for large customers of the drinking water network in Pereira. The project also includes the establishment of a mobile automated data reading and collection system for these consumers. Construction works are planned for a duration of 12 months up to December 2016.
 
30.07.2015
AUDIT OF THE SEWERAGE SYSTEM IN KOROR, REPUBLIC OF PALAU
WMI has been selected to perform an audit of the sewerage system of Koror. A campaign of flow measurements and quality analysis is carried out on wastewater, on 39 pumping stations, 7 points of the network, and at the wastewater treatment station so as to establish a hydraulic model for the network resizing. The service is carrying out as part of the Koror-Arai Sanitation Project.
 
29.05.2015
DIAGNOSTIC OF PHYSICAL LOSSES, LEAK DETECTION AND REPAIR ON THE DRINKING NETWORK IN YANGON CITY, DISTRICT OF THINGANGYUN, MYANMAR

In the framework of the DeveloPPP program, WMI in collaboration with GIZ carry out a diagnostic of physical losses on a pilot sector of the drinking water network of Yangon city in Thingangyun district (> 100 km). The services include the update of the cadastre of the network and the implementation of an innovative helium gas tracking method for detecting and locating physical leakage considering the intermittent supply of water and the low pressure on the network. Continuous training of technicians and managers of Yangon City Development Committee (YCDC) is carrying out on the concepts and technologies to detect and reduce physical and commercial losses on the drinking water network of Yangon City.
 
METERING AND BUSINESS MANAGEMENT
One problem that water-system managers must solve and/or prevent from recurring is inadequate metering. To help prevent under-reporting of water use, WMI provides technical solutions along with a water meter-renewal policy that features diagnostics and...
REDUCTION OF THE PHYSICAL WATER LOSSES OF THE WATER DISTRIBUTION NETWORK OF CASABLANCA
Reduce as much as possible the physical water losses in the critical water supplying area (WSA) of Casablanca city (supplying time 24h/24h), Lydec, delegated authority operating on the network with the aim of reaching as soon as possible an overall network efficiency of 85%.
LEGAL NOTICES   .   SITE MAP   .   WWW.VINCI-CONSTRUCTION-PROJECTS.COM