EXTENSION OF WATER RESOURCES FOR FAISALABAD CITY - PHASE 1
Pakistan
EXTENSION OF WATER RESOURCES FOR FAISALABAD CITY - PHASE 1

• Construction of Jhal Water Treatment Plant;
• Laying of a new arterial main (1,200 mm diameter);
• Replacement of pumps;
• Construction of Rakh Branch Upstream Well field (10 Tube Wells);
• Distribution network optimization (WMI).


Description of WMI services


  • Installation of 42 new PRV’s and condition assessment of all existing PRV’s;
  • Installation of 2 Ultrasonic flow meters ND 1,600 mm;
  • Replacement of 49 bulk meters (ND from 200 to 300 mm);
  • Building the hydraulic model (Water GEMS) - 1665 kms water mains;
  • Network zoning of the entire network (design and implementation) - 16 DMZ’s + 91 DMA’s;
  • Leakage detection by Helium gas tracking – 1060 kms network inspected;
  • Installation of a SCADA system – 60 RTU’s + 1 OCR (Topkapi) installed and configured;
  • Domestic consumption profiles (1028 profiles);
  • Replacement of 685 large mechanical meters;
  • Installation of 20 ,000 customers meters ½”;
  • Commercial optimization (tariff, billing system assessment …).

Key results


  • 90 DMA Designed and implemented;
  • SCADA system implemented;
  • Hydraulic model built;
  • Leak detection and repair on 1000 km of lenear.



IDENTITY CARD

   Location
 
Faisalabad , Pakistan
   Date of award
 
11.2012
  Date of completion
 
10.2015