METERING AND RECORDING
METERING AND RECORDING

Flow / pressure measurement campaign

  • Definition of measurement points
  • Determination of appropriate equipment
  • Installation and calibration of equipment
  • Flow, pressure and level measurement campaign (autonomous equipment with/without telemetry)
  • Analysis and validation of measurement data
  • Hydraulics balances

Leak detection program

  • Definition of priorized sectors (losses indicators, Minimum Night Flow)
  • Review of existing leak detection policy
  • Determination of the appropriate equipment and procedures
  • Visible and invisible leak detection campaign (with acoustic amplifier, correlator, pre-localizer)
  • Step testing
  • Definition and implementation of sustainable solutions
  • Repairs follow-up
  • Cost-benefit analysis

NON REVENUE WATER REDUCTION - SERVICE IMPROVEMENT SUSTAINABILITY - JAMAICA
This contract‘s main target is the follow-up of the Network Service Improvement Programme with the objective of long-term sustainability of UFW and billable consumption improvements from the previous contract (Contract 1, Phase 1) in the Project Area.
REDUCTION OF THE PHYSICAL WATER LOSSES OF THE WATER DISTRIBUTION NETWORK OF CASABLANCA
Reduce as much as possible the physical water losses in the critical water supplying area (WSA) of Casablanca city (supplying time 24h/24h), Lydec, delegated authority operating on the network with the aim of reaching as soon as possible an overall network efficiency of 85%.